You're 48 hours from completion.
The money's about to transfer. The keys are about to be yours.
But you need to do ONE more thing:
The pre-completion inspection.
This is your last chance to catch problems before it's too late.
π WHAT IS IT?
A final visit to the property (usually 24-48 hours before completion) to verify:
- Property is in same condition as when you offered
- All fixtures/fittings included in sale are still there
- No damage has occurred
- Seller is actually moving out
WHEN: Day before completion (or morning of completion day if time allows)
WHO: You + solicitor (or just you taking photos)
TIME: 30-60 minutes
β THE PRE-COMPLETION CHECKLIST:
STRUCTURAL CHECK:
β No new cracks, damage, or defects since last viewing
β No evidence of flooding, leaks, or water damage
β All doors and windows work properly
β Heating system functioning
β Hot water working
FIXTURES & FITTINGS:
β All items listed in Fixtures & Fittings form still present:
- Curtain rails/blinds
- Light fittings
- Kitchen appliances (if included)
- Garden shed (if included)
- Built-in wardrobes
- Bathroom fittings
β No damage to any fixtures
β Carpets still in place (if included)
SELLER MOVING OUT:
β Property appears to be clearing out (boxes packed)
β Seller confirms moving out on completion day
β No unexpected tenants/occupants
UTILITIES:
β Electric meter reading noted
β Gas meter reading noted
β Water meter reading noted (if applicable)
β Boiler working
OUTSIDE:
β Garden in reasonable condition
β No rubbish dumped
β Gates/fences intact
β No vehicles abandoned
π¨ RED FLAGS THAT DELAY COMPLETION:
IMMEDIATE STOP:
π© Major damage discovered (flood, fire, structural)
π© Fixtures removed that were included in sale
π© Property not vacant/seller not moving out
π© Utilities disconnected
ACTION: Call solicitor IMMEDIATELY, do NOT complete until resolved.
NEGOTIABLE ISSUES:
β οΈ Minor damage (small marks, scratches)
β οΈ Garden overgrown/messy
β οΈ Some rubbish left
ACTION: Document with photos, negotiate retention or post-completion compensation.
πΈ DOCUMENTATION STRATEGY:
TAKE PHOTOS OF:
- Every room (wide angle + details)
- All meter readings (close-up, clearly showing numbers)
- Any damage or issues
- Items that should remain (fittings, appliances)
- Outside areas
EMAIL TO SOLICITOR:
"Pre-completion inspection completed [DATE]. Property in acceptable condition. Meter readings: Electric [NUMBER], Gas [NUMBER], Water [NUMBER]. All fixtures present. Ready to complete."
β οΈ REAL EXAMPLES (What Can Go Wrong):
EXAMPLE 1: NW4 Hendon
Pre-completion inspection: Seller removed Β£3,000 integrated fridge-freezer listed as included.
Resolution: Completion delayed 2 days, seller paid Β£3,000 compensation.
LESSON: Check fixtures list carefully.
EXAMPLE 2: NW7 Mill Hill
Pre-completion inspection: Discovered leak in bathroom ceiling (wasn't there before).
Resolution: Seller paid Β£1,500 retention held by solicitor until repairs done.
LESSON: Check for new damage.
EXAMPLE 3: NW2 Cricklewood
Pre-completion inspection: Garden filled with rubbish (3 skips worth).
Resolution: Negotiated Β£800 retention for professional clearance.
LESSON: Check outside areas.
EXAMPLE 4: NW11 Golders Green
Pre-completion inspection: Seller still moving out, property full of furniture.
Resolution: Completion delayed to afternoon, all completed fine.
LESSON: Confirm seller's moving schedule.
π‘ THE METER READING IMPORTANCE:
WHY IT MATTERS:
- Final bills calculated from these readings
- Seller pays up to this date
- You pay from this date onward
- Prevents billing disputes
WHAT TO RECORD:
Electric: [Number] Photo: [Date/time stamp]
Gas: [Number] Photo: [Date/time stamp]
Water: [Number] Photo: [Date/time stamp]
EMAIL TO SUPPLIERS:
"I am the new owner of [Address] from [Completion Date]. Final meter readings on [Date]: Electric [Number], Gas [Number], Water [Number]. Please close seller's account and open new account in my name."
π THE KEYS CHECK:
ASK FOR ALL KEYS:
β Front door (main lock + deadlock)
β Back door
β Window locks
β Garage/shed
β Gate
β Alarm code (if applicable)
Test every key works before seller leaves.
π THE COMPLETION DAY SCHEDULE:
MORNING OF COMPLETION:
8:00 AM - Final check with solicitor that everything is ready
9:00 AM - Confirm with removals company
10:00 AM - Solicitor transfers funds
12:00-2:00 PM - Money received, keys released
1:00 PM - Collect keys from estate agent
1:30 PM - Final walk-through of empty property
2:00 PM - Removals arrive
2:30 PM - Start moving in
FINAL WALK-THROUGH (Property Should Be):
β Empty of seller's belongings
β Reasonably clean (broom-clean standard)
β Keys all present
β No damage
β All included items present
β NOT EXPECTED:
- Professional cleaning (unless agreed)
- Repairs to minor wear and tear
- Perfect condition
π¬ THE SOLICITOR CALL:
After inspection, call your solicitor:
You: "Pre-completion inspection done. Property is [fine/has issues]."
If fine:
Solicitor: "Perfect, we'll complete as planned tomorrow."
If issues:
Solicitor: "What issues?" β You explain β Solicitor contacts seller's solicitor β Negotiate retention/delay/compensation
β° TIMING IS CRUCIAL:
TOO EARLY (7+ days before):
- Seller still living there
- Can't assess move-out status
- Things can change
TOO LATE (Completion day morning):
- If problems found, very stressful to resolve
- Removal van potentially turning up while you're negotiating
GOLDILOCKS (24-48 hours before):
- Seller packing up (can see they're leaving)
- Time to resolve any issues
- Not so early that things change
π― THE PEACE OF MIND CHECKLIST:
Before sleeping the night before completion:
β Pre-completion inspection done and documented
β Meter readings recorded and emailed
β Any issues raised with solicitor and resolved
β Removals confirmed for [TIME]
β Keys collection arranged with agent
β Utilities transfer emails sent
β Buildings insurance active from completion date
β You've told work you're moving tomorrow
β Phone charged (you'll need it all day)
β Solicitor's number saved
The pre-completion inspection is your safety net. Use it.
Cherished Blossoms Group's estate agent partners facilitate pre-completion inspections professionallyβthey'll arrange access and ensure everything runs smoothly.
π§ Need checklist help?
